ACME Solar Holdings Ltd
🔋 ACME Solar Expands BESS Capacity in Rajasthan, Eyes 10 GWh by 2027
- Operationalized over 2 GWh of BESS capacity in Rajasthan.
- Total operational BESS capacity now at 591.18 MW / 2,031.24 MWh.
- Plans to operationalize 10 GWh of BESS capacity by 2027.
- 5,081 MW of contracted capacity under construction, including about 15 GWh of BESS installation.
- BESS projects improve grid reliability, optimize power usage, and enhance grid stability.
- Diversified portfolio includes 8,071 MW across solar, wind, storage, and hybrid solutions.
- Operational contracted capacity of 2,990 MW and approximately 2.0 GWh of BESS capacity.