Patel Engineering Ltd
šļø Patel Engineering Wins ā¹1,593 Crore Hydropower Contract in Nepal
⢠Won contract for Package 2 of 669 MW Lower Arun Hydropower Project in Nepal
⢠Project value: ā¹1,593.08 crores (inclusive of VAT)
⢠Contract awarded by SJVN Lower Arun Power Development Company
⢠Scope includes construction of tunnels, shafts, power house, and switchyard
⢠Key components: 10.5m diameter Head Race Tunnel (5.41km length), Surge Shaft, Pressure Shaft
⢠Project execution timeline: 54 months
⢠Location: Sankhuwasabha District, Nepal, near Tumlingtar (264 km from Siliguri, India)
⢠International contract in Nepal
⢠Company has ongoing work at nearby Arun-3 Hydropower project